PROJECTS

Oxford has performed a wide range of new construction, design-build, and sustainment, repair and modernization (SRM) projects for commercial and government agencies ranging to $82 million. In addition, through several Multiple-Award Task Order Contracts (MATOCs) and numerous individual contracts, Oxford has managed 28 design-build and design-bid-build Task Orders valued at over $90 million for the U.S. Army Corps of Engineers (USACE), Europe District, at multiple military bases throughout Israel.

 

PROJECTS HAVE INCLUDED:

  • A-E Design
  • Building Envelope
  • Mechanical/HVAC
  • Electrical/Communications Systems
  • Elevators/Cranes/Monorails
  • Plumbing
  • Fire Protection
  • Finishes
  • Furniture, Fixtures and Equipment (FF&E)

  • Demolition
  • Foundations
  • Utility Connections
  • Water
  • Sewage
  • Site Improvements
  • Paving
  • Fences
  • Landscaping

 
 
 

CONSTRUCTION
– The Reef, Waterfront Square, Philadelphia, Pennsylvania

Oxford delivered this $81.2 million, 179-unit premier condominium tower and parking structure ahead of schedule and within budget. We received all Exceptional ratings, in part for minimizing disruption to the tenants of two adjacent occupied towers

 

CONSTRUCTION
– Jalame Recruitment Center, IDF Jalame Camp, Haifa, Israel

Oxford constructed two 3-story structures made of reinforced concrete. Each building is approximately 1,850 square meters. Project cost: $10.7 million.

 

Sustainment Repair & Modernization (SRM)
– T and H Buildings at Site 261

Oxford’s repair and modernization included replacement of chillers, pumps, piping, electrical and building controls at Building T. We also replaced electrical and communication systems, and constructed a new structure for high and low voltage electrical systems at Building H.

 

RUNWAY REPAIRS
– Ovda AB, Ramon AB, Tel Nof AB, Israel

Oxford received Outstanding ratings and was referred for future work for our $3.4 million repair and repaving of Ovda Central Runways and Taxiway Renovations, Ramon Taxiway F Renovation, and Tel Nof Western Taxiway Renovation.

 

CONSTRUCTION
– Combat Flight Academy, Hatzerim AFB, Israel

Oxford constructed a $7.7 million, one story academic training facility with five wings and internal courtyards.

 

CONSTRUCTION
– Golani Brigade Compound and HVAC Upgrade

Oxford completed a $4.5 million Task Order consisting of a new company quarters, the addition of a second floor to an existing building and the refurbishment of the central HVAC system.

 

DESIGN-BUILD
– Rittenhouse 1715, Philadelphia, Pennsylvania

Oxford delivered a $7 million D-B interior renovation of four historic buildings into an 18,500 square foot, 23 room hotel. Oxford was able to quickly redesign the project when the budget was reduced from $11.5 million to $7 million.

 

CONSTRUCTION
– Phase 2, IDF Site 81, Tel Aviv, Israel

Oxford minimized disruption to ongoing operations in an occupied facility while constructing a new 5th story of an existing building and build-out of a 6,000 square meter basement floor. Included crane and monorail crane conveyance systems. Cost: $28 million.

 

DESIGN-BUILD
– Korat Gag Building At Glilot Base, Herzliya, Israel

Oxford performed a $7.8 million D-B project for two 3-story dormitory buildings, an administration power station and a “green” HVAC system.

 

CONSTRUCTION
– Kubia 124 At Palmachim AFB And Log 8669 At Tel Nof AFB, Israel

Oxford completed a $3.9 million Task Order to construct a 450 square meter structure at Palmachim AFB, and a logistics building and a transformer room at Tel Nof AFB.

 

CONSTRUCTION
– Maintenance Building At Site 13271, Israel